Units

Everything about one unit: its turn-off decisions and the loss it rides through, when it ran, how it bids, and what it earned.

Loading data…

All units

Every generator and battery the site follows, one row each (a combined-cycle train is one row; searching a configuration name finds its train). Search by name, plant, county, settlement point, QSE, company or buyer, pick a technology, or open More filters for type, group, zone, QSE and DAM behavior, then click a unit to open its page. Sort by any column; the CSV has every column.

How the columns are built

The list has every unit seen in ERCOT's disclosures since the site's data begins, so it counts more units than were online on any one day (batteries especially: many are new or run only some days). Group is the unit's timescale group in the latest forecast (how often it shuts down; thermal only). Capacity is the 95th percentile of each day's highest HSL (high sustained limit, the most it told ERCOT it could run). ERCOT type is the resource type in ERCOT's DAM files (SCGT90 and SCLE90 are gas turbines over and under 90 MW, DSL diesel and gas engines). Quick-start standby, Self-committed, Three-part offer, Day-ahead award and On outage are thermal only: the share of the unit's days in the last 90 days of DAM data with an hour in quick-start standby (OFFQS), with the unit self-committed (resource status ON or ONOS for at least half the day), with a three-part offer (a start-up or minimum-energy cost offered), with a day-ahead energy award, and on outage (status OUT all day). A unit can score on several, and a combined-cycle train counts a day when any configuration does. Each DAM behavior chip narrows the list: Yes keeps units on at or above the chosen share of days, No those below it (at "any day", Yes is at least one day and No is none). Name, county and zone come from ERCOT's Capacity, Demand and Reserves report, matched on the unit code; plant marks a unit matched only to its plant, which is how combined-cycle trains match, since the report lists each turbine. The search box also searches these names. Batteries renamed for RTC+B (names ending _ESR1) mostly match the report only by plant. Shut rate where shutting paid is combined cycle and gas steam only: of the stretches where shutting down would have paid at the day-ahead node price (the loss from staying on beat the restart cost and nothing held it on), the share the unit turned off for, averaged over 2019–21 and over 2024 on, counting only years with at least 8 such stretches; the bracket is the change in percentage points. Sorting on it lists the biggest drops first. Each year is on the unit's own page under Decision history, and every unit side by side on Will fossil turn off?, question 3.

Technology

Loading units…