Every chart below uses that day. Pick a different example unit or hour at the top; the text describes the default, Rio Nogales combined cycle at HE 13.
STEP 1
Two decisions, made on two clocks
Whether a unit runs at all and how much it produces are separate decisions, made by different parties at different times.
- On or off (commitment) is decided by the unit's owner, through its QSE (the company that schedules and bids it), hours to days ahead. The QSE reports each hour's planned status in the Current Operating Plan (COP). ERCOT can add units through reliability unit commitment (RUC), but it does not turn units off to save money.
- How much (dispatch) is decided by SCED, ERCOT's real-time market, every five minutes. It only moves units that are already on, and only within each unit's limits: between its minimum output (LSL) and its maximum (HSL), narrowed by how fast it can ramp. Inside that range SCED follows the unit's offer curve, running the cheapest offered MW first until supply meets demand (steps 2 and 3).
SCED never turns a unit on or off. So a negative price on its own does not shut anything down: it only pushes online units down toward their minimum output.
Fuel, maintenance, start-up plans. The QSE decides which units to run.
QSE decidesFinancial, voluntary. Three-part offers can win an energy award for each hour.
QSE offers, ERCOT clearsQSE reports planned status per hour. ERCOT may commit extra units for reliability.
QSE reports, ERCOT checksSets each online unit's output (base point) and the price, from its offer curve, within its LSL to HSL limits.
ERCOT dispatchesSTEP 2
Anatomy of an offer curve
An energy offer curve is a list of price and MW points. Each point says: "once the price reaches this level, I am willing to run at this many MW." ERCOT draws straight lines between the points, so a price between two points maps to an output between them. The curve sets the most SCED will ask of the unit at a given price; SCED can still run it lower than that, for example when its ramp limits or local congestion hold it back.
Two limits matter. HSL (high sustained limit) is the most the unit can produce right now. LSL (low sustained limit) is the least it can produce and stay online: its minimum output. Rio Nogales' LSL is about 475 MW out of 800 MW.
The shaded block from 0 MW to LSL is not a bid. While the unit is on, those MW run at any price; the only way to stop them is to turn the unit off (step 1). Whatever prices the curve shows below LSL never set dispatch or the market price.
Switch to "As ERCOT uses it" to see the curve SCED actually ran on. ERCOT fills the space from 0 MW up to the first offered point with a placeholder price (usually −$20), so in ERCOT's version the LSL block looks like MW offered at −$20. It is minimum output, not an offer to run at −$20.
See the technology totals in the Day view's Offer curves chart →
STEP 3
What SCED can actually move
SCED reads the curve from LSL up. Drag the price: the dot is where SCED would put the unit at that price. It follows the curve above LSL and stops at LSL however low the price goes.
In each five-minute run SCED also respects ramp limits, so the real range is a little narrower than LSL to HSL: LDL and HDL (low and high dispatch limits). The chart below shows the whole day: from HE 10 to HE 17 the price was negative and Rio Nogales sat at its minimum output, because SCED had no lower point to send it to.
Price can only move an online unit between its LSL and HSL. When the price falls, SCED backs each unit down toward LSL until it reaches MW the unit offered at or below that price. So at negative prices, the thermal MW still running above LSL are only those offered at or below the negative price (or held up for a few minutes by ramp limits). Everything else is minimum output that SCED cannot touch.
STEP 4
The stay-on decision
When a stretch of cheap hours is coming, the owner of an online unit chooses between two costs:
- Stay on: run at LSL through the stretch, paying fuel for every MWh and being paid the (negative) price for it.
- Cycle off: shut down and restart for the evening, paying a start cost, accepting a minimum time offline, and risking a failed or late start.
The figures here use the site's Stay-on calculation. Most example units had no three-part offer that day, so their costs are generic and only a rough guide. They say cycling off would have been cheaper, and those units stayed on anyway. Common reasons are start risk and wear, minimum off times, gas already bought, ancillary service awards and the cost of being wrong about the evening ramp.
Quail Run is the counterexample. It is in West Texas, where Waha gas traded at −$3.21/MMBtu that day, so burning gas earned money. It offered its output below −$30, ran above its minimum through the whole stretch, and came out ahead by staying on, even before the restart it avoided.
Trends has the full Stay-on, Shutdowns and "Who turns off for cheap stretches" charts →
SIDEQUEST
Doesn't the day-ahead market decide who runs?
Not directly. The day-ahead market (DAM) is financial and voluntary. A QSE can offer a three-part offer: a start-up cost, a minimum-energy cost (for running at LSL) and an energy curve above it. If it clears, the unit gets an hourly energy award, a promise to deliver at the day-ahead price or buy back the difference in real time.
A DAM award is not a commitment instruction, and many units run without one. Rio Nogales had awards overnight and in the evening but none from HE 11 to HE 17, and it ran at minimum output through those hours anyway.
Across the fleet that day…
Some plants never use the day-ahead market at all. On every day loaded on this site, W.A. Parish, Limestone and Oak Grove submitted no DAM energy offer, so their on/off schedule is set entirely by their owners.
ON THIS SITE
What “From LSL” means
Add up every online unit and the minimum output blocks form a large spike at the bottom of the offer stack. In ERCOT's version (step 2) the spike sits at −$20, which makes it look as though many gigawatts are bid at −$20 and are ready to move. They are not.
"From LSL" is how this site draws and counts offers instead. For each technology it takes the online units' total LSL and adds only the MW they offer above LSL at or below each price. The curve runs flat at the LSL total from the left edge, then rises with the real bids. The flat part answers "how much runs regardless of price", and the rise answers "how much moves with price". Switch views to compare.
- Offer curves (Day view): "From LSL" is the default. "As ERCOT prices it" shows the curves SCED saw, with minimum output at the placeholder price.
- Marginal supply and Marginal offer stack (Day view), Marginal supply by settled price and Thermal offer prices (Trends): count only MW above LSL, since only those can be marginal.
- Unit metrics: "≤ $0 as submitted" is a share of the range from LSL to HSL. "First offer price above $0", implied heat rate and the bidding-change signals read the curve from LSL up.
- Charts that keep LSL on purpose: the Floor chart's "≤ −$20, as used", "≤ $0 as used", thermal output in cheap hours and Stay-on. These are about who is running, so minimum output belongs in them.
- 2-day days (the most recent two months) have no unit limits, so they show curves as ERCOT prices them.
STEP 5
Reading the site with this in mind
Most charts answer one of two questions. Knowing which one helps avoid reading minimum output as a bid.
Commitment: who is on?
Decided by owners, hours or days ahead. Includes minimum output.
- Floor-priced MW (≤ −$20 as used): almost all of it is LSL
- Capacity by status, Running vs price, Starts per day
- Thermal output in cheap hours, Shutdowns and two-shifting, Who turns off for cheap stretches
- Inflexibility by technology: "≤ $0 as used" and "At floor"
- Plant economics: what running cost and earned
Bidding: what do the MW above LSL ask?
Set by the offer curve, read from LSL up. This is where price moves come from.
- Offer curves (the rise above the flat LSL part), Marginal supply, Marginal offer stack by price
- Thermal offer prices, Natural gas and implied heat rate
- Marginal supply by settled price, Changes in bidding approach
- Wind and solar offer prices: wind and solar have no meaningful LSL, so their whole curve is a bid