Day-ahead offers

What thermal units ask the day-ahead market for, and whether it keeps them on through cheap hours. A combined cycle that wants to ride through a cheap stretch offers its minimum energy near $0; one that wants out offers around $20 to $30 and loses the award.

Loading data…

How a three-part offer works?

Thermal units sell into ERCOT's day-ahead market (DAM) with a three-part offer. The DAM picks which units to commit for each hour of the next day at least total cost, so it weighs all three parts together across the whole day, not hour by hour. An awarded unit is paid the day-ahead price, not its offer.

MW offered $/MWh fuel-cost line ② minimum-energy offer ③ energy curve LSL HSL ① start-up cost $ per start: hot, inter, cold
① Start-up cost
A lump sum per start, in three versions by how long the unit has been off (hot, intermediate, cold). A unit already running pays none, so a start cost makes staying on through cheap hours cheaper than stopping and restarting.
② Minimum-energy offer
The $/MWh price for running at minimum output (LSL, the low sustained limit). This is the part that decides cheap hours: offer it near $0 and the DAM keeps the unit on; offer $20 to $30 and the DAM usually lets it go.
③ Energy curve
Prices for each block of output above LSL, up to the unit's maximum (HSL). It sets how far the unit is dispatched up once it is on.
Terms used below
Cheap hours
Hours with a DA system lambda at or below $10. A day with any is a cheap day; its cheap hours are the cheap stretch.
Awarded through the cheap hours
The DAM awarded the unit energy in at least half of the cheap hours. This is the DAM's result, not whether the unit ran.
Fuel-cost line
The unit's own heat rate at minimum output (measured from EPA stack data; the technology median without one) times the gas price at the unit's own hub. An offer below it is an offer below fuel cost.
Implied heat rate
The minimum-energy offer divided by the hub gas price, in MMBtu/MWh.
Configuration and train
A combined cycle train (say 2 gas turbines and a steam turbine) offers each running mode as a separate configuration and runs one at a time. Fleet counts are by train; unit charts show each configuration.
Offer change
A minimum-energy offer that moves $5 or more and holds, a short price-out, a start-cost change, or a unit starting or stopping three-part offers. Major changes cross the fuel-cost line or fall on cheap days.

Who offered to stay on, cheap day by cheap day

Offer below the node price and you stay on

Combined cycle configuration-days grouped by the minimum-energy offer minus the node's average DA price in the cheap hours. Left of zero the offer sat below the node price, right of zero above it. Each bar is how often the DAM kept that configuration on through the cheap stretch.

Offer minus fuel cost

Every combined cycle train on every cheap day, pooled: its minimum-energy offer over the cheap hours minus fuel cost. A train with a DAM award in at least half the cheap hours counts at the configuration that won; one without, at its lowest configuration offer. Below zero, the offer is under fuel cost. Dotted lines mark each group's median, and the end bins hold everything beyond them. The award is the DAM's result, not whether the train ran.

Who offers below fuel cost

Which trains make a habit of underbidding fuel, by how often they shut down. Each dot is a combined cycle train with three-part offers on at least 10 cheap days, placed by the share of those days its minimum-energy offer sat below its fuel cost (the awarded configuration, else its lowest); rows are the Turn-ons and Turn-offs groups and dot size is MW. Green dots were awarded through the cheap hours on half or more of their cheap days. A ringed dot is priced off Waha gas, where a $0 offer can still be above fuel cost. Each row's count is the trains below fuel cost on over 75% of their cheap days. Click a dot to open the train.

Trains and plants

Combined cycle trains and gas steam plants that file three-part offers, over the cheap days they filed on. Click a header to sort and a name to open its Unit page, which charts each configuration's offer against its fuel cost.

Day-ahead offer changes

Offer changes beside every other change on What's changing →

Wind and solar day-ahead offers

Wind and solar units that file a day-ahead energy curve: the price below which they will not sell day-ahead (DA floor) against the floor they bid in real time, and how much of their available energy the DAM awarded. A DA floor well above the RT floor is a unit that only sells day-ahead when the price is worth it and lets the rest clear in real time; a DA floor at or below the RT floor with a high award share is a unit selling forward. The gap column is the median of each day's gap, so it need not equal the two medians' difference. Click a name for its Unit page.

Day-ahead sales through energy-only offers at the plant's node are not included, so this undercounts the plant's day-ahead exposure. Fleet-wide, awards on these curves cover about 5% of available energy; adding energy-only sales raises that to about 14% (9-day sample).

How thermal is committed

In cheap hours (under $10/MWh), most thermal minimum output online is self-committed, most of the rest is committed by a day-ahead award, and ERCOT's own reliability commitments (RUC) are a negligible share.

By month: average GW online over the chosen hours

By hour of day, whole period

How the output was sold: day-ahead or real time

In cheap hours (under $10/MWh), most wind and solar output is not sold day-ahead at the plant: it settles at the real-time price.

By technology: average GW of output over the chosen hours, whole period

By month, chosen technology

By hour of day, chosen technology, whole period